User:Mcf2o9ee43

From FragoriaWiki

Revision as of 18:20, 24 April 2013 by Mcf2o9ee43 (Talk | contribs)
(diff) ← Older revision | Current revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Hangzhou start building the first canal tunnel (Figure) Ne

's start date,ray ban, probably in July and August next year, you can shield construction,toms shoes. The end of 2010 for the completion of the main work well with shield construction of civil engineering part, next into the decoration and equipment commissioning phase, and was opened to traffic in late 2011. The Qianjiang New CMC staff told reporters that the reason for using the tunnel in the form of the vehicle to go down, in order to keep the canal into the landscape of the Qiantang River estuary. Of course, the tunnel is a pass, from Qianjiang New CBD to the Phase II expansion area, five Fort, Jiubao people, will bring a lot of convenience. Because now, most people should Hanghai go over there, and the Navigation Road strip the old road, the road conditions are not good enough, already unbearable vehicles burden, causing vehicles to and from this passage is not smooth. With this tunnel,louboutin pas cher, we can along the Jiangdong Road go straight through the canal tunnel leading to the riverside highway. According to the introduction, counting from the starting point of the canal tunnel to Xiasha the distance is about 12.2 km, than go Hanghai a lot faster. More importantly, under construction along the highway is landscape Avenue,toms outlet, and along the way has a width ranging from green belt landscape, some even up to a few tens of meters wide,louboutin pas cher, also visible several leisure plaza, viewing platform. Of course, in addition to the canal tunnel and has Genshan East, the future will construction Qianjiang Road, the King altar road extension, so that, in the future there will be four channels connected to the core area and two expansion later down the sand direction The access will be more convenient,ray ban. Park wavy elements inspired by the the Qiantang tide started yesterday Wangjiang Park in Hangzhou the west side of the location of the new radio and television center, the east looking influx Road, north of the administrative center to be built on city land, south of the River Road, West to Wangjiang Road. The land area of ​​about 43,000 square meters, with a total construction area of ​​20,000 square meters. After viewing the park, will feel the front of the wave at the crest of wave, design philosophy because it is on the landscape design elements reflect the history of the Qiantang River tide from the tide legend. For example,oakley, you may find the northwest edge of the water and the plant looks like Qiantang surface wave reflection here. Of course, there are the wavelike mountains but also a symbol of the West side of the mountain, in order to reflect the characteristics of the Qianjiang New,louboutin. So, in the future it will be built into the "benchmark" of Qianjiang New Park,ray ban. Many people are worried, play here, parking space, leisure facilities will not keep up with. In fact, in addition to built ground park will also be built underground parking garage, where 290 motor vehicle parking spaces, bike garage area of ​​more than 900 m2. Come here in the future, the parking is very convenient. In addition, underground supermarket area of ​​over 4000 square meters, the public came away from here, and certainly do not have to worry about drinking less water, buy food,abercrombie france. In addition, in order to facilitate the public to appreciate the Qiantang and park scenery, here also built a tearoom and concept of the concept of river park tearoom tearoom 5 layer view of the river, building 23.8 m high,tory burch outlet, Layer 2 View Park tearoom, more than 12 meters high ,air jordan pas cher. It also set up a pedestrian bridge, directly connected to the Qiantang River flood control embankment, Guo Zhijiang people can cross the road directly and Qiantang close, said the pedestrian bridge awning is wavy. This park is a total investment of 91.74 million yuan and a construction period of 450 days. Expected during the first half of 2011,air jordan, you can walk here.</p>

Related articles:

  • National civil servants qualified public subjects written sc
  • October macroeconomic data released today, analysts said the CPI
  • Play online Lecture Hall 266 notice can delay vision

Personal tools